Host-to-host migration – single site
A full host-to-host migration, tested before cutover and verified after.
Showing fixes 289–304
A full host-to-host migration, tested before cutover and verified after.
A focused summary of your hosting and DNS setup, distinct from the broader architecture document.
Why your site is being throttled, investigated as far as your host's own control panel allows.
Hotlink and leech protection configured, without blocking legitimate embedding you actually want.
Migrating order storage to HPOS, safely. We verify compatibility, migrate on staging first, and confirm every order survives intact.
hreflang tags corrected — missing return links, wrong codes, all made properly reciprocal.
Requests are being rate-limited and refused. We find what is being throttled and why, then fix the cause — whether that is a bot, a plugin,…
Your server returns a 500 error instead of the page. We read the server logs, find what is actually failing, fix it, and confirm every template…
The server accepts the request then gives up waiting for a response. We work out which layer is timing out, fix what we can reach, and…
Every hardcoded HTTP reference updated to HTTPS — not just the certificate installed.
An HTTPS warning despite a certificate being installed, traced to the actual mismatch.
HubSpot forms and tracking correctly wired to your site through delegated access.
Images display cropped, stretched, or at the wrong aspect ratio. We correct the underlying dimension mismatch causing the distorted display.
Image filenames and alt text rewritten from what each image actually shows — no keyword stuffing.
Up to 10 replacement images swapped in, keeping existing placement and sizing intact.
Up to 200 replacement images swapped in for a full sitewide visual refresh.